- Delivery of WK-type Centrifugal Pumps to Uzmetkombinat JSC, Bekabad, Uzbekistan
- Reformer tubes for Maxam-Chirchiq JSS (Chirchik).
- Assembly and commissioning of DSMR-UZ FERGHANA Burners at Fargonaazot JSC (Fergana).
- Replacing the complete set of vertical burners with new energy-saving burners of individual design with the assigned type DSMR-UZ CHIRCHIK for the reformer of the AM-76 Unit at Maxam-Chirchiq JSS(Chirchik).
- Common project with MWL Apparatebau GmbH Grimma on production, supply and installation of a specially designed horizontal heat-exchanger (with heat-exchange surface 1054 m2, operating pressure 320 bar) for Fargonaazot JSC (Fergana).
- Modernization and automation of heat recovery boiler No.2 at Uzmetkombinat JSC (Bekabad).
- Stepwise replacement of chlorate cells in defoliant production at Fargonaazot JSC (Fergana).
- Engineering and modernization of the walking-beam reheating furnace No.2 of the roll mill 300 to reduce gas flow rate by 40%, scale losses, and increase design capacity at Uzmetkombinat JSC (Bekabad).
- Repair of reformer with complete replacement of reforming tubes and linings at Maxam-Chirchiq JSS (Chirchik).
- Repair of the secondary reformer lining; renewal of the ammonia pumps at Fargonaazot JSC (Fergana).
- Service maintenance, installation, and commissioning of pumps and compressors at Bukhara Refinery (Bukhara).
- Common project with MWL Apparatebau GmbH Grimma on production, supply and installation of specially designed horizontal heat-exchanger for Maxam-Chirchiq JSS (Chirchik).
- Modernization of the urea production plant; replacement, installation, start-up and commissioning of Sundyne high-speed single-stage pumps; changing of checkout and control system in Urea Workshop at Maxam-Chirchiq JSS (Chirchik).